McKarlen Vietnam · Engineering Solutions

Engineering Solutions

Start with the system requirement and operating data. This Hub helps MEP/EPC teams, factories and technical companies identify the Solution family, prepare the required information and continue to the appropriate product, evidence or support layer.

01 · Engineering requirement

Start with the engineering requirement, not a model list

Choose the direction closest to the project. Final pump-family and configuration confirmation still depends on actual data.

Application and system

Water supply, circulation, boosting, treatment, wastewater or several coordinated MEP duties.

Duty point

Required flow, head or pressure, operating schedule, pump quantity and redundancy.

Actual conditions

Liquid, source, piping, available space, power supply and control approach.

Available documents

Pump Schedule, P&ID, drawings or BOQ to identify missing inputs.

02 · Application selector

Six Solution families

Select by system duty. Links to individual Solution pages will be activated when their destinations are ready.

System application → engineering purpose → relevant pump family.

01

Water supply and transfer for factories and technical utilities based on the duty point, source condition and operating mode.

Related families: CI / VI; qualified HCR.

02

Water circulation reviewed against flow, head, piping arrangement, plant-room space and operating mode.

Related families: CI / VI; HCR only for a confirmed duty.

03

Review pressure, demand variation, source condition, zones and redundancy before confirming an approach.

Related families: HCR where suitable; HCRE remains restricted.

04
Process water

Water Treatment and RO

Confirm the process stage, duty point, water quality, temperature, pressure and material requirements.

Related families: HCR; CI / VI for suitable duties.

05

Review the wastewater, solids, sump, piping, duty point and installation or removal approach.

Related families: ACI for sewage; BL/KL for high-volume drainage, subject to individual model limits.

06
MEP coordination

MEP Water Systems

Separate supply, circulation, boosting and drainage duties to review documents, interfaces and responsibilities.

Related families: CI / VI, ACI and HCR by separate duty.

03 · Technical review & required data

Review through one clear data flow

One module connects the review sequence with the required information instead of repeating two separate lists.

Review sequence

01

Define: application, system duty and duty point.

02

Qualify: liquid, source, operation, redundancy and installation conditions.

03

Verify: pump-family role, electrical, control, documents and Evidence Gaps.

04

Proceed: confirm missing inputs and the next support scope.

Information to prepare

Hydraulic & process

Required flow, head or pressure; liquid type and temperature; solids or special properties where relevant.

Source, operation & installation

Source level/pressure, schedule, pump quantity, redundancy, piping, space and maintenance access.

Electrical, control & documents

Supply, protection, control mode, Pump Schedule, P&ID, drawings, BOQ and document requirements.

04 · Connected engineering platform

Continue to the appropriate information layer

Equipment layer

Products

Review product families after the equipment role within the system has been identified.

Open Product Center

Evidence layer

Project evidence

The Project Library is a separate evidence layer governed by technical records and approved content rights.

Support layer

Technical support

Submit project data, a pump-selection request or a document enquiry through the current Contact route.

Contact technical support

05 · Evidence & responsibility control

Evidence and responsibility boundaries

The Hub guides the decision path; it does not replace system design or final model confirmation.

01

No blanket claims

No common flow, head, pressure or material range is presented for an entire Solution.

02

No invented project cases

No customer, location or result is displayed without an approved public evidence package.

03

Controlled documents

Model- and project-specific documents follow their controlled access state and confirmed inputs.

04

Responsibility boundaries

HCRE and claims without a baseline remain restricted; design, construction and commissioning stay with the responsible parties.

06 · Engineering enquiry

Prepare a technical project enquiry

Submit available data so the responsible team can identify missing inputs and discuss the appropriate technical step.

  • Application
  • Duty point
  • Liquid
  • Operation
  • Electrical & control
  • Documents

Projects and Field Records

Explore pump rooms, treatment equipment, inline pumps and delivery photographs to prepare information for a similar site.

Explore 16 field record groups