Feed-water transfer
Move clean or pretreated water to the next process stage.
MCKARLEN VIETNAM · ENGINEERING SOLUTIONS
Define the pump duty by process stage, water quality, temperature, pressure and materials—without inferring plant capacity or treatment results.
01 · APPLICATION CONTEXT
Move clean or pretreated water to the next process stage.
Review pump duty against the pressure required by process documents.
Circulate or transfer water between tanks and treatment equipment.
Review liquid, temperature, materials and operating cycle.
02 · ENGINEERING CHALLENGES
TDS, pH, chemicals, solids and temperature are insufficient for material confirmation.
Valves, membranes, fouling and operating modes change system resistance.
The pump does not represent treatment performance or outlet-water quality.
P&ID, datasheet, Pump Schedule and BOQ are not aligned.
03 · REQUIRED PROJECT DATA
| Process stage | Pump location in PFD/P&ID, duty and operating mode. |
|---|---|
| Hydraulics | Flow, pressure/head, tank levels, piping and equipment losses. |
| Liquid | Composition, TDS, pH, temperature, solids, chemicals and material requirement. |
| Documents | Pump Schedule, process datasheet, electrical/control data and document requirement. |
04 · ENGINEERING APPROACH
05 · PRODUCT ROLE
HCR is a vertical multistage stainless-steel centrifugal pump; CI/VI covers suitable inline circulation or transfer duties; HSS is a horizontal multistage stainless-steel centrifugal pump for compatible clean-water duties. Every option requires model and liquid confirmation.
Use only after duty, liquid, model and configuration are confirmed.
Use only after duty, liquid, model and configuration are confirmed.
Use only after duty, liquid, model and configuration are confirmed.
06 · RESPONSIBILITY CONTROL
07 · DOCUMENT CONTROL
Release only the confirmed family, model and revision. Legacy catalogues or documents with obsolete identity are not converted into public downloads.
08 · EVIDENCE GATE
No project record currently meets the evidence and usage-right threshold for publication on this page. No Project Case card is created until that evidence exists.
09 · KNOWLEDGE
Process stage, liquid, temperature, materials, operating modes and system documents are needed.
No. Duty, liquid, arrangement and material requirements differ.
No. This page addresses pump equipment within supplied data.
Only approved documents. Model-specific records remain request-controlled.