Define the pump duty by process stage, water quality, temperature, pressure and materials—without inferring plant capacity or treatment results.

01 · APPLICATION CONTEXT

Application and system context

01

Feed-water transfer

Move clean or pretreated water to the next process stage.

02

RO and membrane duty

Review pump duty against the pressure required by process documents.

03

Process water

Circulate or transfer water between tanks and treatment equipment.

04

CIP and utilities

Review liquid, temperature, materials and operating cycle.

02 · ENGINEERING CHALLENGES

Common engineering challenges

01

Unclear water quality

TDS, pH, chemicals, solids and temperature are insufficient for material confirmation.

02

Changing duty

Valves, membranes, fouling and operating modes change system resistance.

03

Process boundary

The pump does not represent treatment performance or outlet-water quality.

04

Fragmented documents

P&ID, datasheet, Pump Schedule and BOQ are not aligned.

03 · REQUIRED PROJECT DATA

Required project data

Process stage Pump location in PFD/P&ID, duty and operating mode.
Hydraulics Flow, pressure/head, tank levels, piping and equipment losses.
Liquid Composition, TDS, pH, temperature, solids, chemicals and material requirement.
Documents Pump Schedule, process datasheet, electrical/control data and document requirement.

04 · ENGINEERING APPROACH

Review and selection flow

  1. Define the process stage and pump-equipment boundary.
  2. Normalize hydraulic data and operating modes.
  3. Review liquid, materials and seal by model.
  4. Compare HCR, CI/VI or HSS against duty and arrangement.
  5. Confirm model, documents and items requiring process-engineer approval.

05 · PRODUCT ROLE

Relevant product families

HCR is a vertical multistage stainless-steel centrifugal pump; CI/VI covers suitable inline circulation or transfer duties; HSS is a horizontal multistage stainless-steel centrifugal pump for compatible clean-water duties. Every option requires model and liquid confirmation.

CONTROLLED FAMILY

HCR

Use only after duty, liquid, model and configuration are confirmed.

CONTROLLED FAMILY

CI / VI

Use only after duty, liquid, model and configuration are confirmed.

CONTROLLED FAMILY

HSS

Use only after duty, liquid, model and configuration are confirmed.

06 · RESPONSIBILITY CONTROL

Selection and responsibility boundaries

McKarlen scope

  • Review pump duty from supplied process data
  • Recommend family/model and required material checks
  • Provide model-controlled curve, drawing and datasheet

Responsible-party scope

  • Guarantee treated-water quality or RO recovery
  • Design the complete water-treatment process
  • Publish plant capacity or project results without evidence

07 · DOCUMENT CONTROL

Technical documents and evidence

  • Reviewed Pump Schedule / BOQAvailable
  • Correct model curveRequest by model
  • Model-specific dimensional drawingRequest by model
  • Datasheet and material confirmationRequest by model

Document-use principle

Release only the confirmed family, model and revision. Legacy catalogues or documents with obsolete identity are not converted into public downloads.

08 · EVIDENCE GATE

Project evidence

No project record currently meets the evidence and usage-right threshold for publication on this page. No Project Case card is created until that evidence exists.

09 · KNOWLEDGE

Engineering knowledge / FAQ

What is required beyond flow and pressure?

Process stage, liquid, temperature, materials, operating modes and system documents are needed.

Can one pump family cover every stage?

No. Duty, liquid, arrangement and material requirements differ.

Does McKarlen guarantee outlet-water quality?

No. This page addresses pump equipment within supplied data.

Which catalogues are public?

Only approved documents. Model-specific records remain request-controlled.

10 · VIETNAM SUPPORT

Technical support in Vietnam

Support covers data intake, duty review, model selection, technical documents, spare parts, warranty and after-sales within the supplied-equipment scope.

Project-data review
Model / configuration selection
Documents and after-sales support

11 · PROJECT ENQUIRY

Prepare a technical enquiry

ApplicationFlowHead / pressureLiquidDocuments

Submit technical enquiry