Pump Selection Support for HVAC & Chiller

HVAC & Chiller Systems

McKarlen reviews submitted project data and pump duties for chilled-water, central HVAC, heating-water and cooling-water circulation applications.

Application scope

Circulation duties reviewed against project data

Each enquiry is reviewed against flow, total head, liquid, temperature, piping arrangement, installation position and operating requirements.

Chilled-water circulation

Review the Duty Point, temperature, piping losses and pump arrangement.

Central HVAC circulation

Prepare inline-pump selection data against the system schematic and available installation space.

Heating-water circulation

Confirm temperature, liquid and operating conditions before model selection.

Cooling-water circulation

Review flow, total head, temperature and the system boundary stated in the project documents.

Commercial buildings, hotels, hospitals and factories are application contexts only. They are not a list of published McKarlen project references.

Review risks

Common issues before pump selection

Missing or inconsistent data can result in the wrong Duty Point, pump configuration or Technical Document set.

Incomplete duty definition

Flow is available, but total head does not fully reflect static conditions and losses through pipes, valves or equipment.

Unclear circulation arrangement

Source conditions, pipe routing, equipment positions and operating requirements are not aligned.

Installation position not reviewed

Connection orientation, installation height and maintenance clearance remain unclear.

Incomplete system resistance data

Pipe sizes, route length, valves and heat-exchange equipment are not fully represented in the project data.

Unconfirmed operating arrangement

Pump quantity, operating schedule, control requirements and standby expectations have not been confirmed.

Inconsistent project documents

The Pump Schedule, BOQ and drawings use different equipment descriptions or operating conditions.

Input data

Required Project Data

Submit the information already available. The technical team will identify missing inputs before recommending a model.

Application and Duty Point
  • System application
  • Design flow
  • Design total head
  • Operating temperature
  • Liquid type
Piping arrangement and installation position
  • Circulation-loop or piping schematic
  • Pipe connection requirement
  • Installation position and maintenance clearance
Operation, electrical supply and control
  • Operating schedule
  • Available electrical supply
  • Control requirement
  • Proposed pump quantity if already defined
Project Technical File
  • System drawings
  • Pump Schedule
  • BOQ

Complete inputs allow the technical team to review the Duty Point, CI or VI configuration and required document scope before recommending a model.

Relevant product families

CI and VI are reviewed against the system arrangement

CI and VI are considered only after the Duty Point, piping arrangement and operating conditions have been reviewed.

CI horizontal inline pump for HVAC and Chiller systems

CI Series

A horizontal inline pump configuration considered for HVAC & Chiller circulation when the Duty Point, liquid and piping arrangement suit the model.

Horizontal inlineHVAC circulationModel confirmation
VI vertical inline pump for HVAC and Chiller systems

VI Series

A vertical inline pump configuration considered where the connection orientation, installation space and operating conditions suit the model.

Vertical inlineHVAC circulationModel confirmation

Engineering boundary

Review scope and responsibilities

Recommendations apply only to the pump and supplied equipment within the agreed scope.

Duty Point

Flow and total head must be reviewed together; pipe size alone is not a Pump Selection basis.

CI and VI data

CI values, Pump Curves or Dimensional Drawings must not be presented as VI data, or vice versa.

Model conditions

Temperature, liquid, electrical supply, connection arrangement, control requirements and operation require model-specific confirmation.

McKarlen scope

Project-data and duty review, Pump Selection support, model recommendation, Technical Documents and pump-related installation guidance within the supply scope.

Outside McKarlen’s scope

Complete HVAC, cooling-tower, building MEP, fire-protection, civil or structural design.

Energy performance

Any quantified efficiency or consumption claim requires verified evidence for the specific project.

Documents and support

Technical Documents for the confirmed model

Documents are supplied according to the model, Duty Point and access state. Not every document is a public download.

CI / VI Catalogue

PUBLIC DOWNLOAD

Access the approved public document through the CI / VI product page.

View CI / VI Series

Dimensional Drawing

REQUEST REQUIRED

Supplied for the selected CI or VI configuration and model when an applicable drawing is available.

Request Technical Documents

Motor Information and Accessory Recommendation

PROJECT REVIEW REQUIRED

Reviewed against the electrical supply, configuration, control requirements and supply scope.

Request Technical Documents

Equipment Installation Guidance

PROJECT REVIEW REQUIRED

Pump-related guidance supplied against the piping arrangement, installation position and maintenance requirements.

Request Technical Documents

Application records

Project references

Commercial buildings, hotels, hospitals and factories shown on this page are application contexts only. A record is published as a verified McKarlen equipment reference only when equipment participation, the supply or product-support scope, technical evidence and image-use rights have been approved.

Commercial buildingsHotelsHospitalsFactories

Engineering knowledge

Prepare the right data before submitting an enquiry

These three entries cover the data to submit, the CI / VI selection boundary and the Technical Documents required for the confirmed model.

Required Project Data

Review flow, total head, liquid, temperature, piping, electrical supply and control requirements.

Review required data

CI or VI selection logic

Review the Duty Point, piping orientation, installation space and operating conditions.

Review selection boundaries

Model-specific Technical Documents

Identify when a Product Datasheet, Pump Curve, Dimensional Drawing, Motor Information or Equipment Installation Guidance is required.

Review Technical Documents

Engineering FAQ

Questions to resolve before Engineering Review

The answers focus on Required Project Data, Pump Selection, Technical Documents and the responsibility boundary.

What project data are required for an HVAC & Chiller pump review?

Provide the application, design flow, total head, temperature, liquid type, piping arrangement, installation position, operating schedule, electrical supply, control requirement and any available Pump Schedule or BOQ.

When may CI or VI be considered?

CI is considered for a horizontal inline arrangement, while VI is considered for a vertical inline arrangement. The decision also depends on the Duty Point, piping arrangement, installation space, liquid and operating conditions.

Why must flow and total head be reviewed together?

Together they establish the Duty Point used to review the model and Pump Curve. Either value on its own is insufficient for confirmation.

Can a pump be selected from pipe size alone?

No. Flow, total head, system losses, temperature, liquid and operating requirements must also be reviewed.

Which Technical Documents may McKarlen provide?

Depending on the model and review state, the deliverables may include a Product Datasheet, Pump Curve, Dimensional Drawing when available, Motor Information, Accessory Recommendation and pump-related Equipment Installation Guidance.

When are the correct model documents supplied?

Documents are supplied after the Duty Point, CI or VI configuration, frequency, electrical supply and relevant project conditions have been confirmed.

Does McKarlen’s support include complete HVAC system design?

No. McKarlen supports project-data review, Pump Selection and Technical Documents within the agreed equipment supply scope. Complete HVAC, cooling-tower, building MEP, fire-protection, civil and structural design remains with the appointed consultant, designer or contractor.

Project enquiry

Do you have drawings, a Pump Schedule, BOQ or operating data?

Submit the available documents with the flow, total head, liquid, temperature, piping arrangement, installation position, electrical supply and control requirement. The technical team will review the Duty Point, identify missing inputs and define the next technical step.

FlowTotal HeadTemperatureLiquidDrawings / BOQ