Chilled-water circulation
Review the Duty Point, temperature, piping losses and pump arrangement.
Pump Selection Support for HVAC & Chiller
McKarlen reviews submitted project data and pump duties for chilled-water, central HVAC, heating-water and cooling-water circulation applications.
Application scope
Each enquiry is reviewed against flow, total head, liquid, temperature, piping arrangement, installation position and operating requirements.
Review the Duty Point, temperature, piping losses and pump arrangement.
Prepare inline-pump selection data against the system schematic and available installation space.
Confirm temperature, liquid and operating conditions before model selection.
Review flow, total head, temperature and the system boundary stated in the project documents.
Commercial buildings, hotels, hospitals and factories are application contexts only. They are not a list of published McKarlen project references.
Review risks
Missing or inconsistent data can result in the wrong Duty Point, pump configuration or Technical Document set.
Flow is available, but total head does not fully reflect static conditions and losses through pipes, valves or equipment.
Source conditions, pipe routing, equipment positions and operating requirements are not aligned.
Connection orientation, installation height and maintenance clearance remain unclear.
Pipe sizes, route length, valves and heat-exchange equipment are not fully represented in the project data.
Pump quantity, operating schedule, control requirements and standby expectations have not been confirmed.
The Pump Schedule, BOQ and drawings use different equipment descriptions or operating conditions.
Input data
Submit the information already available. The technical team will identify missing inputs before recommending a model.
Complete inputs allow the technical team to review the Duty Point, CI or VI configuration and required document scope before recommending a model.
Engineering review process
McKarlen reviews the pump-related scope. Overall system design remains with the appointed consultant, designer or contractor.
Record the application, available documents and requested review scope.
Check flow, total head, liquid, temperature, piping, electrical supply, control requirements and installation position.
Reconcile the submitted data, establish the Duty Point and identify assumptions or missing inputs.
Review CI or VI, the model, configuration and Technical Documents against approved sources.
Quote the confirmed technical scope and verify the equipment identity and documents before delivery.
Review technical, spare-parts or warranty requests against the model, serial information, delivery records and operating conditions.
This process does not include complete HVAC system design or design disciplines outside the agreed equipment supply scope.
Relevant product families
CI and VI are considered only after the Duty Point, piping arrangement and operating conditions have been reviewed.

A horizontal inline pump configuration considered for HVAC & Chiller circulation when the Duty Point, liquid and piping arrangement suit the model.

A vertical inline pump configuration considered where the connection orientation, installation space and operating conditions suit the model.
Engineering boundary
Recommendations apply only to the pump and supplied equipment within the agreed scope.
Flow and total head must be reviewed together; pipe size alone is not a Pump Selection basis.
CI values, Pump Curves or Dimensional Drawings must not be presented as VI data, or vice versa.
Temperature, liquid, electrical supply, connection arrangement, control requirements and operation require model-specific confirmation.
Project-data and duty review, Pump Selection support, model recommendation, Technical Documents and pump-related installation guidance within the supply scope.
Complete HVAC, cooling-tower, building MEP, fire-protection, civil or structural design.
Any quantified efficiency or consumption claim requires verified evidence for the specific project.
Documents and support
Documents are supplied according to the model, Duty Point and access state. Not every document is a public download.
PUBLIC DOWNLOAD
Access the approved public document through the CI / VI product page.
REQUEST REQUIRED
Supplied for the confirmed model and configuration.
REQUEST REQUIRED
Supplied for the confirmed model, frequency and Duty Point.
REQUEST REQUIRED
Supplied for the selected CI or VI configuration and model when an applicable drawing is available.
PROJECT REVIEW REQUIRED
Reviewed against the electrical supply, configuration, control requirements and supply scope.
PROJECT REVIEW REQUIRED
Pump-related guidance supplied against the piping arrangement, installation position and maintenance requirements.
Application records
Commercial buildings, hotels, hospitals and factories shown on this page are application contexts only. A record is published as a verified McKarlen equipment reference only when equipment participation, the supply or product-support scope, technical evidence and image-use rights have been approved.
Engineering knowledge
These three entries cover the data to submit, the CI / VI selection boundary and the Technical Documents required for the confirmed model.
Review flow, total head, liquid, temperature, piping, electrical supply and control requirements.
Review the Duty Point, piping orientation, installation space and operating conditions.
Identify when a Product Datasheet, Pump Curve, Dimensional Drawing, Motor Information or Equipment Installation Guidance is required.
Engineering FAQ
The answers focus on Required Project Data, Pump Selection, Technical Documents and the responsibility boundary.
Provide the application, design flow, total head, temperature, liquid type, piping arrangement, installation position, operating schedule, electrical supply, control requirement and any available Pump Schedule or BOQ.
CI is considered for a horizontal inline arrangement, while VI is considered for a vertical inline arrangement. The decision also depends on the Duty Point, piping arrangement, installation space, liquid and operating conditions.
Together they establish the Duty Point used to review the model and Pump Curve. Either value on its own is insufficient for confirmation.
No. Flow, total head, system losses, temperature, liquid and operating requirements must also be reviewed.
Depending on the model and review state, the deliverables may include a Product Datasheet, Pump Curve, Dimensional Drawing when available, Motor Information, Accessory Recommendation and pump-related Equipment Installation Guidance.
Documents are supplied after the Duty Point, CI or VI configuration, frequency, electrical supply and relevant project conditions have been confirmed.
No. McKarlen supports project-data review, Pump Selection and Technical Documents within the agreed equipment supply scope. Complete HVAC, cooling-tower, building MEP, fire-protection, civil and structural design remains with the appointed consultant, designer or contractor.
Project enquiry
Submit the available documents with the flow, total head, liquid, temperature, piping arrangement, installation position, electrical supply and control requirement. The technical team will review the Duty Point, identify missing inputs and define the next technical step.